Please visit the site and some of the pgs so that I can see the hit counters doing their job...
www.workhorsepainting.com
Also made changes to the site map and added the bid example pg that links off of the two header label images (Free Estimates, Competitive Bids) Added another link to the garage floor epoxy pg from a small jpg image of the job with a label added to it. The added image link is on the residential interior jobs pg. I may put some links to contracts of the jobs on the respective large font names of the jobs at the top of the respective pgs such as the Garage Floor Epoxy label at the top of that pg would be a link to the contract for that job Guess that that would be a third level link. First level the main heading of interior jobs Second level the specific interior job Third level a link to the contract.
Is this linking arrangement too confusing? I can flo chart diagram it accurately on the site map